Woking Town Local Cycling and Walking Infrastructure Plan (LCWIP)

Contents

What is the Woking Town LCWIP?

The Woking Town Local Cycling and Walking Infrastructure Plan (LCWIP) is a ten-year plan to improve walking and cycling across the borough. It shows where investment should be focused and sets out early ideas for making it easier and safer for people to walk and cycle.
LCWIPs are the national best-practice way to plan walking and cycling improvements. The Woking Town LCWIP has been developed following the Department for Transport guidance. For more information about LCWIPs and how they have been developed across Surrey, please visit our plans to improve walking and cycling page.

The LCWIP focuses on major routes and connections across the borough. Its aim is to create a joined-up network for walking and cycling. Smaller improvements at neighbourhood and street level are not included in the LCWIP and will be delivered through separate projects. For example, we plan to develop 'Liveable Neighbourhood' schemes. These projects will make residential streets safer, more comfortable and easier to use for walking and cycling. They recognise that streets are places for people, not just routes for vehicles. 'Liveable Neighbourhoods' will create attractive local areas that link into the wider LCWIP network, making walking and cycling easier, safer and more enjoyable for everyone. For more information about our plans for walking and cycling in local streets and neighbourhoods, please see the Local Transport Plan policies on Planning for Place and for Active Travel and Personal Mobility.

If you would like a copy of the full Woking Town LCWIP report please email surreytransportplan@surreycc.gov.uk.

Executive summary

The main proposals in the Woking Town LCWIP are a series of cycling routes and walking zones. Together, these will form a town-wide network for walking and cycling. All routes and zones have been placed into one of three phases. This helps us decide the order in which improvements should be delivered over the ten-year life of the plan:

  • Phase 1 – improvements we hope to deliver in the short term.
  • Phase 2 – improvements planned for the medium term.
  • Phase 3 – improvements for the longer term.

Routes and zones have been prioritised using several factors, including:

  • Current and future demand, supported by local feedback, road collision data and expected levels of use.
    The improvement in quality compared with existing facilities.
  • How well the route or zone improves access to key destinations, such as schools, GP surgeries, hospitals, railway stations, bus stations, town centres and parks.

The full LCWIP report includes maps showing all proposed cycling routes and walking zones. It also provides early design ideas for Phase 1 schemes and explains how all routes and zones have been prioritised. The LCWIP covers the whole town, with a focus on key destinations that attract trips and encourage more people to choose walking and cycling for everyday journeys.

Cycling network

Woking has an established cycle network in the Planet Trails (information on the Planet Trails is available on our website). These are a planet-themed suite of cycle routes that cover much of Woking borough, introduced as part of the Cycle Woking initiative in 2009.

The LCWIP builds upon this investment to reach more of Woking's neighbourhoods with better quality cycling facilities.

Phase 1 cycling routes

Europa trail

This route connects Horsell High Street to Woking town centre via Church Hill, Brewery Road and Chobham Road Bridge. It will upgrade existing provision.

Lockfield Drive

Following Lockfield Drive, the route will run from the roundabout at Lockfield Drive and Littlewick Road to the town centre.

Saturn trail (Arthur's Bridge to Monument Road)

This route covers the Basingstoke Canal towpath in both directions from the town centre. It will run to Hermitage Road Bridge in the west and Lambourne Crescent and Bishop David Brown School in the east.

Recommendations for this route focus on the section of the Saturn Trail between Arthur's Bridge in the west, through the town centre to Monument Road in the east. This section currently experiences high levels of cycling and it is an important connection between other existing and proposed cycle routes. Improvements will be sensitive to the canal's other functions. For instance, no new lighting would be installed away from the town centre, and cycle calming would be introduced to help walkers and cyclists share the towpath where separation is not possible.

Ceres trail (The Broadway to Albert Drive)

Via Victoria Arch, this route connects West Byfleet railway station to Woking town centre. It follows Woodland Avenue, Sheerwater Road, Albert Drive, Arnold Road, Maybury Road and The Broadway.

Recommendations will improve upon the route's existing conditions, focussing on increasing comfort, safety and making the route easier to navigate.

Deimos trail

Connecting Lion Retail Park to Woking town centre at Victoria Arch, this route follows Oriental Road, Station Approach and Victoria Road. Improvements will be made to upgrade the existing cycling facilities.

The map shows the locations of the Phase 1 cycling routes:

Phase 2 cycling routes

  • Jupiter Trail. This route connects Woking High School to the town centre via Ridgeway, Footpath 19, Brewery Road and Chobham Road Bridge.
  • Pluto Trail. Following Victoria Road, Inkerman Way, Barrack Path, Robin Hood Road, St Johns Road, Kingsway, Goldsworth Road and the High Street, this route connects Knaphill centre to Woking town centre at Victoria Arch.
  • Fisher's Hill to Goldsworth Road Morrisons. Via Mile Path, College Lane, Triggs Lane and Goldsworth Road.
  • Fisher's Hill to Guildford Road. The route will follow Mile Path, Wych Hill, Star Hill and Wych Hill Lane. Two alternative options are being considered for the second section of the route: either along York Road to the junction with Guildford Road; or continuing along Wych Hill Lane to follow Guildford Road to Claremont Avenue. These options will be investigated further when the route reaches the feasibility stage of its development.
  • Earth Trail. This route links Elm Bridge to the town centre via Woking Park, Constitution Hill, Guildford Road and Victoria Way.
  • Mars Trail (South). Linking the southern entrance to Woking railway station to Mayford Roundabout, this route follows Westfield Road, Westfield Avenue, Woking Park and White Rose Lane.
  • Mars Trail (North). This route links Ottershaw to Woking railway station via Brox Road, the A320 and Chertsey Road.
  • Oberon Trail. This route follows Maybury Hill to link Maybury Inn and Maybury Road.
  • Venus Trail. Via White Rose Lane, this route links Hoe Bridge School to Woking railway station.

Walking network

Phase 1 walking routes

Chertsey Road

This route follows Chertsey Road from Woking railway station to Carlton Road.

Recommendations include improvements to address the narrow footways, close proximity to traffic and high traffic speeds that are present along much of the route. A review of crossing locations will improve both convenience and safety. It is recommended that the missing section of footway linking to the entrance to Horsell Common and an associated crossing should be installed. The route would also benefit from the introduction of tactile paving, dropped kerbs, and resurfacing.

Maybury Road

This route runs northeast away from Victoria Arch on the High Street, Broadway and then along Maybury Road to the Maybury Arch. The route is of high quality in the town centre, and this should be extended beyond Locke Way and out of the town centre.

Recommendations include resurfacing and widening pavements, making them fully accessible, removing pavement clutter, removing or replacing vegetation and addressing issues of cars parking on pavements. The route has high traffic volumes, speeds and noise, which will ideally be reduced. Sight lines and conflict points with both motor vehicle traffic and bicycles will be reviewed. There is no pavement on the south side of Maybury Road meaning that access to the bus stops located there and to the pavement on the south side of Broadway needs improvement.

Maybury Hill: canal to College Road section

Running from Monument Road canal bridge, the route follows Monument Road and then Maybury Hill to its junction with Old Woking Road. As this is already a popular route for pedestrians, the College Road section of this route is being prioritised for comprehensive improvements. Targeted improvements will consider the remainder of the route.

The prioritised section of the route would benefit from measures to reduce the dominance of motor vehicle traffic, as well as the replacement of damaged street furniture, and cleaning. On Maybury Hill, there are issues with footpath condition and proximity to traffic, and a need to introduce and modernise accessibility features such as dropped kerbs and tactile paving.

White Rose Lane: Woking railway station to Woking College section

This route runs from Station Approach, along White Rose Lane to the Jack and Jill steps, and through the park. It heads between the ponds and passes to the east of the leisure centre before following Elmbridge Lane and Sundridge Lane to the St John the Baptist School and Woking College.

Horsell

From Jubilee Square, the route heads north on Mercia Walk and Bedser Bridge, along the east side of Horsell Common and uses the footpath network around St Andrew's School to reach Wilson Way, Horsell High Street and Horsell Church of England Junior School. An additional section extends from the footpath network around St Andrew's School and along Ridgeway (a private road but with a public right of way) to reach Woking High School.

The off-road footpaths on this route are surrounded by high fencing, whilst footways are narrow and in poor condition in places. Improvements should address this, and the footpath network would also benefit from improved signposting. In the Horsell High Street area, high motor vehicle traffic dominance discourages walking to the high street and the condition of the footways is poor in places. Accessibility measures, such as dropped kerbs and tactile paving, are lacking and needed in some locations including outside Woking High School.

The map shows the locations of the Phase 1 walking routes:

Phase 2 walking routes

  • Basingstoke Canal (West). This route runs from Chobham Lane bridge to Langmans Lane bridge, heading west from the town centre.
  • Basingstoke Canal (East). This route runs east from the town centre, from Chobham Road bridge to the path that connects the canal towpath to Blackmore Crescent, near Bateson Way in Sheerwater.
  • Oriental Road. Serving the southern entrance of Woking railway station, this route follows Oriental Road, College Road and East Hill to the junction with Old Woking Road.
  • Heathside Road. From Station Approach, the route follows Heathside Road and then Pembroke Road to its junction with Maybury Hill.
  • Park Road. This route begins at Oriental Road, briefly follows Heathside Crescent, and follows Park Road to the junction with Old Woking Road.
  • Guildford Road. From the southern entrance to Woking railway station, the route follows Station Approach southwest to join Guildford Road, Constitution Hill and then re-joins Guildford Road to the Turnoak Roundabout. An additional section of this route runs along Mount Hermon Road, whilst another spur follows Claremont Avenue and the A247 to Woking football club. A third additional section connects Constitution Hill to the football club and White Rose Lane via the park.
  • Goldsworth Road. This route follows Goldsworth Road and Bridge Barn Lane from Victoria Arch. It crosses Arthur's Bridge and then follows Lockfield Drive and footpaths through the centre of Goldsworth Park estate to reach Kestrel Way. An additional section from Goldsworth Road extends to follow Kingsway and St Johns Road to the junction with Janoway Hill Lane.
  • Chobham Road. This route runs from Chertsey Road to Woodham Lane, along Chobham Road.
  • Wych Hill Lane. From Turnoak Roundabout, the route follows Wych Hill Lane, Triggs Lane and Goldsworth Road to the junction with Bridge Barn Lane.
  • Twin Bridges. This route follows Mount Hermon Road along footpath 68. It crosses Goldsworth Road and the canal via Step Bridge to reach Horsell Moor Recreation Ground. An additional section leaves footpath 68, joining and running along footpath 69 and De Lara Way to the junction with Kingsway.

Next steps

The Woking Town LCWIP report should be used to support the case for further stages of design, assessment, and stakeholder engagement, and to secure funding to progress improvements for the routes identified by the report. Because the LCWIP is intended to facilitate a long-term approach to developing active travel proposals, over a period of approximately 10 years, all of the routes identified are recommended for further consideration at an appropriate time.

The next stage of implementing the LCWIP will be to further develop the design concepts for the Phase 1 cycling and walking routes into a feasibility level of design and assessment. This will include full public consultation, allowing residents and other local stakeholders to have their say on the individual scheme proposals.

The LCWIP will be reviewed and updated periodically, particularly in response to significant changes in local circumstances such as the publication of new policies or strategies.

If you wish to view the full Woking Town LCWIP report or report annexes, please email surreytransportplan@surreycc.gov.uk requesting a copy.

Chertsey Road

The section of the Chertsey Road Phase 1 walking route between Woking railway station and Duke Street has recently been improved through the provision of a wider footway, resurfacing, traffic calming measures and the introduction of new plants to improve drainage in line with the LCWIP recommendations.


Did you find this information helpful?