A286 Grayswood Road, Haslemere SGN works

Duration

7 October 2019 to 3 November 2019

Reason for Works

Replacement of approximately 691 metres of old iron gas main with new polyethylene (plastic) pipes along with associated service connections from properties onto the new main. As the iron gas mains have been in the ground for decades, they are reaching the end of their useful life span. The reason the old iron gas mains needs replacing is due to fractures and corrosion of the pipe resulting in gas leaks which could result in catastrophic consequences such as damage to buildings, severe injury or even, in extreme cases, death. The benefits of new PE (plastic) pipes are; Resistance to corrosion, saves energy, smaller risk of leakage and recyclable.

Extents of Works

The works start at the junctions with Three Gates Lane and Church Lane to approximately 60m south of the junction with Highercombe Road (outside Chesham Cottage).

Traffic Management

  • Two-Way Signals: These will be used on the straight sections of carriageway between junctions.
  • Multi-Way Signals: These will be used when SGN are working at the junctions with Three Gates Lane/Church Lane and Highercombe Road.

If you have any enquiries about these works please visit the SGN website.