How we maintain local roads, pavements, and the wider highway network in Surrey
What are we responsible for maintaining?
Surrey County Council is responsible for a high volume of highway assets including roads, pavements, cycleways and public rights of way, highway structures (bridges, retaining walls, culverts), traffic signals, safety barriers, gullies and other drainage assets as well other assets such as streetlights, road signs, highway trees and verges.
The lengths of the networks and some of the assets we are responsible for are shown below.
Lengths of roads, pavements and cycleways (miles)
- Roads - 3318
- Pavements - 3524
- Cycleways - 342
- Public rights of way - 2176
Number/ lengths of highway structures, traffic signals and other assets
- Highway structure, including public rights of way (bridge, retaining walls, and culverts) - 1750
- Traffic signals - 667
- Vehicle restrait systems (safety barriers) - 73 miles
The Department for Transport also publishes statistics on road lengths which can be found at Road length statistics (RDL) - GOV.UK.
Key challenges to maintaining our network include:
- The impact of the motorway network, including the M25, M3 and M23 and joining arterial roads, impacts Surrey’s traffic levels more than some other authorities. This leads to increased local congestion, wear from heavy vehicles on local roads and complicated diversion impacts.
- The changing patterns of goods vehicles using less suitable smaller roads because of increased sat nav usage increases over running and edge deterioration on lanes.
- The impact of changing weather patterns such as wetter winters leads to accelerated condition deterioration of roads, with a greater impact on poorer condition roads. This expands defect clusters quickly and leads to higher winter peaks of defects than seen in previous years.
- The impact of increased summer heat causes softening of bitumen, and thermal expansion of concrete. This leads to increased deterioration of roads.
Road conditions in Surrey
A-roads
| Year | Percentage of road in red category | Percentage of road in amber category | Percentage of road in green category |
|---|---|---|---|
| 2023 | 5% | 25% | 70% |
| 2024 | 4% | 23% | 73% |
| 2025 | 4% | 24% | 71% |
B-roads and C-roads
| Year | Percentage of road in red category | Percentage of road in amber category | Percentage of road in green category |
|---|---|---|---|
| 2023 | 6% | 25% | 69% |
| 2024 | 5% | 24% | 71% |
| 2025 | 5% | 26% | 69% |
Unclassified roads
| Year | Percentage of road in red category |
|---|---|
| 2023 | 15% |
| 2024 | 21% |
| 2025 | 22% |
Councils use road condition surveys to assess the state of their roads. The results are grouped into three categories:
- Green - the road is in good condition and no further investigation or treatment is required
- Amber - the road may need maintenance soon
- Red - the road is in poor condition and should be considered for maintenance
More detail about the methodology, timing and coverage of this data is available on Road Conditions in England to March 2025.
Additional information on carriageway condition
In 2022 we changed our survey method and frequency for unclassified roads to one that uses video and machine learning technology. This has led to a steady increase in red condition during the transition period. A comparison between the two survey methods indicated that the new technology would lead to an increase in the percentage of network in red condition by 5% compared to the previous method. Therefore, the increase in red condition shown in 2023 and 2024 is primarily due to the change in survey methodology rather than a significant deterioration in condition.
We expect to fully transition to a survey frequency of once every two years on unclassified roads using this new technology by the end of 2026.
What are we doing about potholes and other road defects?
What is a pothole?
Our Highway Safety Inspection Policy - PDF includes a matrix defining the network hierarchy and prioritisation criteria for intervention levels. This defines our inspection regime carried out on all roads and pavements based on a frequency dependent on usage levels and other factors. We have defined priority categories from Priority 1 to Priority 3, as set out below.
Carriageway pothole
Priority 1 (2 hours) - defects presenting the highest risk of harm requiring immediate attention to secure, guard, warn or make safe. Priority 2 (5 working day repair) - Diameter more than 150mm and depth more than 40mm.
Priority 3 (20 working day repair) - Diameter more than 150mm and depth approaching 40mm, with likelihood of worsening in the short term.
Cycle lane pothole
Priority 2 (5 working day repair) - Diameter more than 75mm and depth more than 25mm.
Priority 3 (20 working day repair) - Diameter more than 75mm and depth approaching 25mm, with the likelihood of worsening in the short term. Advanced local crazing likely to cause a pothole.
What we are doing to tackle potholes
We estimate that we repaired around 45,000 potholes on our roads and pavements in 2025/26, as per the intervention levels and classifications in our Highway Safety Inspection Policy and matrix. These repairs are scheduled to our contractor’s operational teams whose objective is to carry out a “first-time fix” wherever possible.
We have various processes as part of our pothole repair programme including:
- Fix Now – where a team can repair any other potholes in close proximity to repairs they have been scheduled to attend.
- Jetpatcher – this uses a process called spray injection patching, where compressed air, bitumen emulsion and aggregate (stone) are sprayed into the damaged area. This is generally used in locations where there are multiple potholes.
- Larger Patching – in some locations where there is a generally poor surface with multiple potholes we will carry out large patches rather than filling individual potholes.
As well as repairing potholes, we carry out various preventative programmes of work to prevent potholes forming in the first place. Some of the preventative treatments we use include surface dressing and micro-asphalt, asphalt preservation, concrete fine milling, slurry seal and crack/joint repairs.
Find out more about how we manage pothole repairs.
How members of public can report potholes and other highway defects
Potholes and other highway defects can be reported on our website or via the FixMyStreet app. All reports are sent to Surrey County Council for action. Customers can also contact us to make reports, requests and enquiries. We operate a 24/7 service via our Highways Hub.
What happens after a pothole is reported?
Potholes reported by the public will be inspected within five days, although this timescale may increase during periods when high volumes are reported. If the reported pothole meets the intervention requirements, then a works order for repair is raised and the customer is provided with an update. If the pothole does not meet the intervention requirements, then the customer is informed, and the location is re-checked during the next scheduled highway safety inspection.
What we spend to maintain the highway network and where the funding comes from
Spending on highways maintenance
| Maintenance type | 2024-2025 | 2025-2026 | 2026-2027 (projected) |
|---|---|---|---|
| Carriageways | £71,624,333 | £67,335,832 | £64,684,443 |
| Footways | £15,263,677 | £11,508,948 | £9,896,139 |
| Structures (for example, bridges or tunnels) | £10,813,262 | £8,891,279 | £10,044,889 |
| Drainage | £13,189,085 | £14,804,911 | £12,826,037 |
| Street lighting | £3,033,501 | £1,402,668 | £1,823,300 |
| Traffic signals | £4,350,423 | £4,227,173 | £4,006,793 |
| Rights of way | £1,750,588 | £2,381,239 | £1,749,009 |
| Other assets | £13,256,615 | £13,599,711 | £15,695,091 |
| Total spend on highways maintenance | £133,281,484 | £124,151,761 | £120,725,701 |
Where our funding for highways maintenance comes from
| Funding sources for highways maintenance | 2024-2025 | 2025-2026 | 2026-2027 (projected) |
|---|---|---|---|
| Funding received through the Department for Transport / UK Government | £28,394,272 | £37,369,518 | £39,302,000 |
| Additional highways maintenance funding provided by the Council or third parties | £104,887,212 | £86,782,242 | £81,423,701 |
| Total | £133,281,484 | £124,151,760 | £120,725,701 |
Our maintenance plans for the year
We plan to:
- Resurface 130 roads providing structural maintenance to over 40 miles of roads.
- Apply surface dressings and other preventative maintenance to a further 104 roads providing 60 miles of preventative treatments.
- Reconstruct 70 pavements covering 20 miles.
- Slurry seal a further 44 footways covering another 20 miles.
- Carry out capital schemes on 21 highway structures.
- We will provide significant drainage improvements to 12 locations prioritised on our list of known wet spots scored and ranked on risk.
- We will carry out refurbishment of 50 traffic signal sites including upgrades to low energy LED lights.
- We are upgrading and replacing 4 Vehicle Restraint Systems totalling 1.25 miles in length.
Further information about maintaining our roads and pavements.
Full list of planned carriageway and footway works
Our Horizon Highways Maintenance Investment Programme includes a map showing the full list of works that are planned during 2026, including instructions on how to create a list of works if required.
How decisions are made on our maintenance plans
Our highways are one of our most valuable public asset. We are committed to managing them effectively for the benefit of everyone who uses them. Following national best practice set out in the Code of Practice for a Well-Managed Highway Infrastructure, we use reliable data to understand the condition and value of our roads and to make informed decision s about investment will have the greatest impact.
A larger share of funding will be directed towards the busiest roads, including the A and B road network, while maintaining the wider network. We will also continue our programme to improve concrete roads, with dedicated funding set aside for this work.
Investment priorities will support wider transport objectives, including safer routes to schools, town centres and transport hubs. Decisions on highway maintenance will be based on factors such as road condition, network importance, safety, risk, value for money and the need to keep people and goods moving efficiently.
Files available to download
-
Highways Maintenance Transparency Report Technical Annex (PDF)
This report provides a breakdown of the capital highways maintenance funding. It is part of the Local highways maintenance transparency report page. -
Highway Safety Inspection Policy - December 2018 (PDF)
The full Highways Safety Inspections Policy used by our inspectors and engineers